Name of Project:Pretreatment System Installation
Owner:Truitt Brothers Inc.
Architect/Engineer:Matrix Technologies
Contract Amount:$480,630.00
Completed:February, 2009
  
Name of Project:Pretreatment System Design Build
Owner:PACCAR Engine Co.
Architect/Engineer:Clearwater Consultants, Inc.
Contract Amount: $1,563,761.35
Completed:July, 2009
  
Name of Project:pH Adjustment System Upgrades
Owner:Patheon
Architect/Engineer:Process Plus
Contract Amount: $58,000.00
Completed:April, 2009
  
Name of Project:Sewer Line Upgrade
Owner:General Mills
Contract Amount:$9,500.00
Completed:January, 2009
  
Name of Project:Club Chef-Aeration & pH
Owner:Club Chef
Architect/Engineer:N/A
Contract Amount:$31,030.00
Completed:February, 2007
  
Name of Project:John Morrell Co. Aeration
Owner:John Morrell Co.
Architect/Engineer:N/A
Contract Amount:$89,380.00
Completed:April, 2007
  
Name of Project:Koch Foods, Inc.-Morton MS
Owner:Koch Foods, Inc.
Architect/Engineer:Clearwater Consultants, Inc.
Contract Amount:$408,385.00
Completed:May, 2007
  
Name of Project:Nestle WWTP Phase II
Owner:Nestle Prepared Foods
Architect/Engineer:GRW
Contract Amount: $1,140,571.00
Completed:August, 2006
  
Name of Project:General Mills WWTP Covington, GA
Owner:General Mills
Architect/EngineerGRW Engineers
Contract Amount:$5,387,636.00
Completed:August, 2006
  
Name of Project:Cook Foods Clarifier Repair
Owner:Cook Foods
Architect/Engineer:N/A
Contract Amount:$14,880.00
Completed:November, 2006
  
Name of Project:Martin Marietta Crusher Tower
Owner:Martin Marietta
Architect/Engineer:Powell Construction
Contract Amount:$1,270,528.00
Completed:April, 2006
  
Name of Project: General Mills Storm Pump Station
Owner:General Mills
Architect/Engineer:ATS Engineers
Contract Amount:$450,000.00
Own Forces:80%
Completed:September, 2002
  
Name of Project:Disinfection and Chemical Feed Improvements (Frankfort Water Treatment Plant)
Owner:Frankfort Electric and Water Plant Board
Architect/Engineer:GRW Engineers, Inc.
Contract Amount:$5,670,000.00
Percent Complete:0%
Scheduled Completion:September, 2010
  
Name of Project:City of Walton, Kentucky Wastewater Treatment Plant No. 1 Expansion
Owner:City of Walton
Architect/Engineer:GRW Engineers, Inc.
Contract Amount:$4,450,974.00
Percentage Complete:25%
Scheduled Completion:November, 2009
  
Name of Project: Pretreatment Building Improvements – Fort Thomas Treatment Plant
Owner:Northern Kentucky Water District
Architect/Engineer:HDR/Quest Engineers, Inc.
Contract Amount:$2,731,115.00
Percentage Complete:50%
Scheduled Completion:September, 2009
  
Name of Project: Sanitation District No.1 Maintenance and Repair
Owner:Sanitation District No.1
Architect/Engineer:Sanitation District No.1
Contract Amount:$16,000,000.00
Percent Complete:95%
Scheduled Completion:April, 2009
  
Name of Project:Dry Fork Road Sanitary Sewer Improvements – Phase 1
Owner:City of Harrision
Architect/Engineer:Arcadis, Inc.
Contract:$980,000
Percentage Complete:0%
Scheduled Completion:March, 2010
  
Name of Project: Polk Run Odor Control and Influent Screen Replacement Project
Owner:MSD of Greater Cincinnati
Architect/Engineer:CH2M Hill
Contract: $402,250.00
Percent Complete:90%
Scheduled Completion:September, 2009
  
Name of Project: Middletown WWTP Sludge Processing and Biosolids Improvements Project
Owner:City of Middletown. OH
Architect/Engineer:CDM
Contract Amount:$13,329,766.00
Percent Complete:85%
Scheduled Completion:August, 2009
  
Name of Project:Taylor Creek WWTP Pump Station Improvements
Owner:City of Cincinnati Metropolitan Sewer District
Architect/Engineer:ENTRANS
Contract Amount:$3,383,888.00
Percent Complete:95%
Completion Date:June, 2009
  
Name of Project: Stones River WTP
Owner:City of Murfreesboro Tennessee
Architect/Engineer:Smith Seckman Reid
Contract Amount:$36,811,118.00
Percent Complete:70%
Scheduled Completion:January, 2010
  
Name of Project:Riley Road Pump Station
Owner:Sanitation District No.1
Architect/Engineer:Malcolm Pirnie
Contract Amount:$4,909,999.00
Own Forces:90%
Completed:November, 2008
  
Name of Project:Falmouth KY, WWTP
Owner:City of Falmouth
Architect/Engineer:GRW Engineers
Contract Amount: $4,746,598.00
Own Forces:90%
Completed:November, 2008
  
Name of Project:Alex-Licking Pump Station
Owner:Sanitation District No. 1
Architect/Engineer:Malcolm Pirnie
Contract Amount:$1,430,000.00
Own Forces:90%
Completed:November, 2008
  
Name of Project:Pond Creek Pump Station
Owner:Sanitation District No. 1
Architect/Engineer:Malcolm Pirnie
Contract Amount: $3,360,000.00
Own Forces:90%
Completed:October, 2008
  
Name of Project:Madisonville KY, WTP
Owner:City of Madisonville
Architect/Engineer:Bell Engineering
Contract Amount:$9,300,000.00
Own Forces:90%
Completed:September, 2008
  
Name of Project:Memorial Pkwy WTP Improvements
Owner:Northern Ky. Water District
Architect/Engineer:Quest Engineers
Contract Amount:$5,899,484.00
Own Forces:90%
Completed:September, 2008
  
Name of Project:Licking River Traveling Screen
Owner:Northern Kentucky Water District
Architect/Engineer:Northern Kentucky Water District
Contract Amount:$163,361.00
Own Forces:90%
Completed:November, 2007
  
Name of Project:Burlington Kentucky Pump Station
Owner:Sanitation District No. 1
Architect/Engineer:Malcolm Pirnie
Contract Amount:$3,296,741.00
Own Forces:90%
Completed:September, 2007
  
Name of Project:Steven Road
Owner:Sanitation District No.1
Architect/Engineer:Sanitation District No.1
Contract Amount:$1,609,488.00
Own Forces:90%
Completed:December, 2006
  
Name of Project:Sanitation District No.1 Maintenance and Repair
Owner:Sanitation District No.1
Architect/Engineer:Sanitation District No.1
Contract Amount: $5,191,932.00
Own Forces:100%
Completed:August, 2006
  
Name of Project:Ft. Thomas Tube Settlers
Owner:Northern Kentucky Water District
Architect/Engineer:Quest
Contract Amount:$570,000.00
Own Forces:80%
Completed:January, 2006
  
Name of Project:Northern Kentucky Water District – US 27 Pump Station
Owner:Northern Kentucky Water District
Architect/Engineer:Burgess and Niple
Contract Amount:$1,700,000.00
Own Forces:85%
Completed:March, 2006
  
Name of Project:Taylor Mill WTP
Owner:Northern Kentucky Water District
Architect/Engineer:Malcolm Pirnie
Contract Amount:$450,000.00
Own Forces:85%
Completed:April, 2006
  
Name of Project:Bromley Roof Upgrades
Owner:Sanitation District No.1
Architect/Engineer:Tetra Tech, Inc.
Contract Amount:$1,200,000.00
Own Forces:60%
Completed:August, 2005
  
Name of Project:Richwood Pump Station
Owner:Sanitation District No.1
Architect/Engineer:Malcolm Pirnie
Contract Amount: $200,000.00
Own Forces:65%
Completed:August, 2005
  
Name of Project:Banklick Pump Station
Owner:Sanitation District No. 1
Architect/Engineer:Burgess and Niple
Contract Amount:$500,000.00
Own Forces:75%
Completed:August, 2005
  
Name of Project:Shelbyville Water Treatment Plant Improvements
Owner:City Of Shelbyville
Architect/Engineer:Quest Engineers
Contract Amount:$1,200,000.00
Own Forces:80%
Completed:August, 2005
  
Name of Project:Corbin, KY Wastewater Treatment Plant
Owner:City of Corbin, KY
Architect/Engineer:GRW Engineers
Contract Amount:$3,300,000.00
Own Forces:80%
Completed:December, 2003
  
Name of Project: Morris Forman Clarifier Rehab
Owner:Louisville MSD
Architect/Engineer:CH2M Hill
Contract Amount: $2,250,000.00
Own Forces:40%
Completed:February, 2004
  
Name of Project:Morris Forman HPO Modifications
Owner:Louisville MSD
Architect/Engineer:CH2M Hill
Contract Amount:$6,850,000.00
Own Forces:90%
Completed:December, 2003
  
Name of Project:Storm Water Pump Station Repairs
Owner:Sanitation District No. 1
Architect/Engineer:GRW Engineers
Contract Amount:$1,800,000.00
Own Forces:80%
Completed:May, 2003
  
Name of Project:Patton Street Pump Station
Owner:Sanitation District No.1
Architect/Engineer:Burgess and Niple LTD.
Contract Amount: $900,000.00
Own Force:90%
Completed:June, 2003
  
Name of Project:Green River Intake
Owner:City Of Madisonville
Architect/Engineer:Howard K. Bell
Contract Amount:$365,000.00
Own Forces:90%
Completed:February, 2003
  
Name of Project:Woolpert Pump Station
Owner:Sanitation District No.1
Architect/Engineer:Burgess and Niple LTD.
Contract Amount:$300,000.00
Own Force:75%
Completed:December, 2002
  
Name of Project:Grayson County WTP
Owner:Grayson County Water District
Architect/Engineer:Cann & Lee
Contract Amount:$3,000,000.00
Own Forces:80%
Completed:September, 2002
  
Name of Project:Edmonson, KY WTP
Owner:City of Brownsville
Architect/Engineer:Elrod-Dunson Engineering
Contract Amount:$3,000,000.00
Own Forces:75%
Completed:July, 2002
  
Name of Project:Providence KY WTP
Owner:City Of Providence
Architect/Engineer:HKB Engineers
Contract Amount:$2,800,000.00
Own Forces:80%
Completed:July, 2002
  
Name of Project:Ky. American Sluice Gate Replacement
Owner:Ky. American Water Association
Architect/Engineer:GRW Engineers
Contract Amount: $275,000.00
Own Forces:100%
Completed:June, 2002
  
Name of Project: Floodgate Repair/Replacement
Owner:Sanitation District No. 1
Architect/Engineer:GRW Engineers
Contract Amount: 2,400,000.00
Own Forces: 95%
Completed:March, 2002
  
Name of Project: Bromley Pump Station Improvements
Owner:Sanitation District No. 1
Architect/Engineer:PDR Engineers
Contract Amount:1,500,000.00
Own Forces:85%
Completed:March, 2001
  
Name of Project:Somerset Raw Water Intake, KY
Owner:City of Somerset
Architect/Engineer:Howard K. Bell Engineers
Contract Amount:4,600,000.00
Own Forces:95%
Completed:February, 2001
  
Name of Project:Morris Forman Diversion Structure
Owner:Louisville MSD
Architect/Engineer:CH2M Hill
Contract Amount:700,000.00
Own Forces:85%
Completed:March, 2001
  
Name of Project:Shelbyville, KY WTP
Owner:Shelbyville Municipal Utilities Commission
Architect/Engineer:HKB Engineers
Contract Amount:$4,000,000.00
Own Forces:85%
Completed:March, 2000
  
Name of Project:Booster Pump Station
Owner:City of Richmond, KY
Architect/Engineer:HKB Engineers
Contract Amount: $800,000.00
Own Forces:85%
Completed:August, 2000
  
Name of Project:Webster County, KY WTP
Owner:Webster County Water District
Architect/Engineer:Neal-Schaeffer Engineers
Contract Amount:$4,000,000.00
Own Forces:85%
Completed:July, 2000
  
Name of Project:Maysville, KY Pumping Station (Contract 3)
Owner:Maysville Utilities Commission
Architect/Engineer:GRW Engineers
Contract Amount: $2,000,000.00
Own Forces:95%
Completed:October, 1999
  
Name of Project:Maysville, KY WWTP (Contract 1)
Owner:Maysville Utilities Commission
Architect/Engineer:GRW Engineers
Contract Amount:$8,000,000.00
Own Forces:80%
Completed:October, 1999
  
Name of Project:Taylor Mill, KY WTP
Owner:N. KY Water Sanitation District
Architect/Engineer:CH2M Hill Engineers
Contract Amount: $4,000,000.00
Own Forces:85%
Completed:October, 1999
  
Name of Project:Morris Forman WWTP
Owner:Louisville M.S.D.
Architect/Engineer:CH2M Hill Engineers
Contract Amount:$2,900,000.00
Own Forces:90%
Completed:January, 1999
  
Name of Project:Morris Forman WWTP Sludge Tanks #2 & #3
Owner:Louisville M.S.D.
Architect/Engineer:CH2M Hill Engineers
Contract Amount:$1,000,000.00
Own Forces:80%
Completed:January, 1999
  
Name of Project:Second Street Screen Station
Owner:Sanitation District No. 1
Architect/Engineer:GRW Engineers
Contract Amount:$400,000.00
Own Forces:95 %
Completed:December, 1998
  
Name of Project:Newport, KY WTP Filter Renovation
Owner:City of Newport
Architect/Engineer:Howard K. Bell
Contract Amount:$500,000.00
Own Forces:95%
Completed:October, 1998
  
Name of Project: Louisville/Crescent Hill WTP Chlorine Mod.
Owner: Louisville Water Company
Architect/Engineer: Quest Engineers
Contract Amount: $882,000.00
Own Forces: 85%
Completed: August, 1998
  
Name of Project: Newport, KY WTP Sludge Building
Owner: City of Newport
Architect/Engineer: Howard K. Bell
Contract Amount: $1,600,000.00
Own Forces: 85%
Completed: January, 1998
  
Name of Project: Bardstown, KY WTP
Owner: City of Bardstown
Architect/Engineer: PDR Engineers
Contract Amount: $1,400,000.00
Own Forces: 85%
Completed: January, 1998
  
Name of Project: Owensboro, KY WWTP
Owner: City of Owensboro
Architect/Engineer: Quest Engineers
Contract Amount: $4,000,000.00
Own Forces: 90%
Completed: January, 1998
  
Name of Project: Irvine, KY WWTP
Owner: City of Irvine
Architect/Engineer: Elrod-Dunson
Contract Amount: $1,009,000.00
Own Forces: 90%
Completed: October, 1997
  
Name of Project: Western Lewis, KY WTP
Owner: Western-Lewis Rectorville Water & Gas District
Architect/Engineer: Mayes Sudderth Etheredge
Contract Amount: $1,200,000.00
Own Forces: 80%
Completed: March, 1997
  
Name of Project: Somerset, KY WTP
Owner: City of Somerset
Architect/Engineer: Howard K. Bell Consulting Engineers
Contract Amount: $4,200,000.00
Own Forces: 85%
Completed: November, 1996
  
Name of Project: Augusta, KY WTP
Owner: City of Augusta
Architect/Engineer: Mayes, Sudderth & Etheredge
Contract Amount: $2,200,000.00
Own Forces: 85%
Completed: October, 1996
  
Name of Project: Walton, KY WWTP
Owner: City of Walton
Architect/Engineer: GRW Engineers, Louisville
Contract Amount: $ 800,000.00
Own Forces: 85%
Completed: August, 1996
  
Name of Project: Leitchfield, KY WTP
Owner:City of Leitchfield
Architect/Engineer:Water Management Services (Nashville)
Contract Amount: $ 800,000.00
Own Forces: 85%
Completed: September, 1996
  
Name of Project: Prestonsburg, KY WWTP
Owner: Prestonsburg Utilities Commission
Architect/Engineer: Prestonsburg Utilities Commission
Contract Amount: $1,000,000.00
Own Forces: 85%
Completed: April, 1996
  
Name of Project: Owenton, KY WTP
Owner: City of Owenton, KY
Architect/Engineer: Mayes, Sudderth & Etheredge
Contract Amount: $1,800,000.00
Own Forces: 90%
Completed: October, 1995
  
Name of Project: Stanton, KY WTP
Owner: Beech Fork Water Commission
Architect/Engineer: Kennoy Engineers
Contract Amount: $2,000,000.00
Own Forces: 85%
Completed: October, 1995
  
Name of Project: Munfordville, KY WWTP
Owner: City of Munfordville
Architect/Engineer: Derrick Engineering
Contract Amount: $1,200,000.00
Own Forces: 90%
Completed: November, 1995
  
Name of Project: Lakeview Pump Station
Owner: Sanitation District No.1
Architect/Engineer: GRW Engineers
Contract Amount: $1,000,000.00
Own Forces: 80%
Completed: October, 1995
  
Name of Project: Lancaster, KY WTP
Owner: City of Lancaster
Architect/Engineer: Elrod-Dunson, Inc.
Contract Amount: $1,200,000.00
Own Forces: 85%
Completed: September, 1995
  
Name of Project: Dry Creek Dechlorination
Owner: Sanitation Dist. of Campbell & Kenton Counties
Architect/Engineer: Malcolm Pirnie
Contract Amount: $400,000.00
Own Forces: 85%
Completed: December, 1994
  
Name of Project: Marrowbone, KY WTP
Owner:Marrowbone Water District
Architect/Engineer: Kenvirons
Contract Amount: $500,000.00
Own Forces: 85%
Completed: March, 1995
  
Name of Project: Ft. Thomas, KY WTP
Owner: Kenton County Water District
Architect/Engineer: Burgess & Niple LTD.
Contract Amount: $1,500,000.00
Own Forces: 90%
Completed: July, 1994
  
Name of Project: Olive Hill, KY WWTP
Owner: City of Olive Hill, KY
Architect/Engineer: Haworth, Meyer, Boleyn, Inc.
Contract Amount: $1,400,000.00
Own Forces: 90%
Completed: February, 1994
  
Name of Project: Prestonsburg, KY WTP
Owner: City of Prestonsburg, KY
Architect/Engineer: Howard K. Bell
Contract Amount: $1,500,000.00
Own Forces: 90%
Completed: April, 1994
  
Name of Project: Flemingsburg, KY WWTP
Owner: City of Flemingsburg
Architect/Engineer: Mayes, Sudderth & Etheredge
Contract Amount: $300,000.00
Own Forces: 90%
Completed: May, 1994
  
Name of Project: Louisville, KY WTP
Owner: City of Louisville, KY
Architect/Engineer: City of Louisville, KY
Contract Amount: $1,300,000.00
Own Forces: 90%
Completed: June, 1993
  
Name of Project: Springfield, KY WTP
Owner: City of Springfield
Architect/Engineer: Mayes, Sudderth, & Etheredge Eng.
Contract Amount: $1,000,000.00
Own Forces: 80%
Completed: December, 1993
  
Name of Project: Falmouth, KY WTP
Owner: City of Falmouth
Architect/Engineer: Quest Engineers
Contract Amount: $1,500,000.00
Own Forces: 80%
Completed: April, 1993
  
Name of Project: Carrollton, KY WTP
Owner: Carrollton Utilities Commission
Architect/Engineer: T.M. Regan
Contract Amount: $1,500,000.00
Own Forces: 80%
Completed: February, 1993
  
Name of Project: Fort Thomas, KY WTP Improvements
Owner: Kenton County Water District
Architect/Engineer: Burgess & Niple LTD.
Contract Amount: $2,500,000.00
Own Forces: 85%
Completed: February, 1993
  
Name of Project: Providence, KY WWTP Improvements
Owner: City of Providence, KY
Architect/Engineer: Howard K. Bell Consulting Eng.
Contract Amount: $2,700,000.00
Own Forces: 85%
Completed: January, 1993
Name of Project: Shelbyville, KY WWTP
Owner: Shelbyville Water & Sewer Commission
Architect/Engineer: Howard K. Bell Engineers
Contract Amount: $2,600,000.00
Own Forces: 80%
Completed: May, 1992
  
Name of Project: Richmond, KY WTP
Owner: City of Richmond, KY Architect/Engineer:
Architect/Engineer: Proctor/Davis/Ray Engineers
Contract Amount: $3,500,000.00
Own Forces: 80%
Completed: February, 1992
  
Name of Project: Fort Scott Wastewater Treatment Plant
Owner: Meyer Builders
Architect/Engineer: BBS Corporation
Contract Amount: $2,856,122.00
Own Forces: 90%
Completed: December, 2007
  
Name of Project: O’Bannon Creek WWTP
Owner: Clermont County Sewer District
Architect/Engineer: Burgess and Niple
Contract Amount: $2,382,768.00
Own Forces: 90%
Completed: July, 2007
  
Name of Project:Milford, Ohio WWTP
Owner:City of Milford
Architect/Engineer:Quest
Contract Amount: $2,884,643.00
Own Forces:90%
Completed: July, 2007
  
Name of Project: Warren County Ohio North Wellfield Expansion
Owner: Warren County Board of Commissioners
Architect/Engineer: Tetra Tech
Contract Amount: $1,508,229.00
Own Forces: 80%
Completed: June, 2007
  
Project: Springboro WWTP Improvements
Owner: Springboro, Ohio
Architect/Engineer: Brown and Caldwell
Contract Amount: $16,617,587.00
Own Forces: 80%
Completed: November, 2006
  
Name of Project: Mill Creek WWTP Sludge Thickening Improv.
Owner: Metropolitan Sewer District (MSD) of Greater Cincinnati
Architect/Engineer: Black and Veatch
Contract Amount: $7,150,000.00
Own Forces: 80%
Completed: June, 2006
  
Name of Project: Cincinnati Water Works Richard Miller WTP Filter Repair
Owner: Greater Cincinnati Water Works
Architect/Engineer: Greater Cincinnati Water Works
Contract Amount: $744,331.00
Own Forces: 90%
Completed: May, 2006
  
Name of Project: Irwin Simpson Booster Pump Station
Owner:Cincinnati Waterworks
Architect/Engineer: Gannett Fleming
Contract Amount: $2,493,000.00
Own Forces: 99%
Completed: September, 2005
  
Name of Project: Polk Run WWTP
Owner: Cincinnati MSD
Architect/Engineer: BBS
Contract Amount: $7,492,471.00
Own Forces: 80%
Completed: May, 2005
  
Name of Project: Lower East Fork Wastewater Treatment Plant
Owner: Clermont County Sewer District
Architect/Engineer: None
Contract Amount: $661,788.00
Own Forces: 95%
Completed: May, 2005
  
Name of Project: Mill Creek Screen Replacement
Owner:Cincinnati MSD
Architect/Engineer:BSS
Contract Amount: $1,858,256.00
Own Forces: 80%
Completed: May, 2005
  
Name of Project: Mill Creek WWTP Raw Sewage Pump Station Improvements
Owner: Metropolitan Sewer District (MSD) of Greater Cincinnati
Architect/Engineer: URS Corporation
Contract Amount: $535,000.00
Own Forces: 95%
Completed: October, 2005
  
Name of Project: Ohio River Pumping Station
Owner: City of Cincinnati
Architect/Engineer: Montgomery Watson
Contract Amount: 9,575,450.000
Own Forces: 80%
Completed: November, 2004
  
Name of Project: Hamilton Compost
Owner: City of Hamilton
Architect/Engineer: Burgess and Niple
Contract Amount: $450,000.00
Own Force: 80%
Completed: January, 2003
  
Name of Project: Cincinnati Water Works
Owner: City of Cincinnati
Architect/Engineer: City of Cincinnati
Contract Amount: 2,000,000
Own Forces: 85%
Completed: May, 2001
  
Name of Project: Hamilton, OH North WTP
Owner: City of Hamilton
Architect/Engineer: Burgess & Niple, LTD
Contract Amount: $800,000.00
Own Forces: 85%
Completed: May, 2001
  
Name of Project: North Pisgah Pump Station
Owner: Butler County Board of Commissioners
Architect/Engineer: Camp, Dresser & McGee
Contract Amount: $800,000.00
Own Forces: 85%
Completed: May, 2001
  
Name of Project: Washington C. H. WWTP
Owner: City of Washington, Ohio
Architect/Engineer: BBS LTD
Contract Amount: 5,000,000
Own Forces: 85%
Completed: February, 2001
  
Name of Project: Blanchester, Ohio WWTP
Owner: Village of Blanchester, OH
Architect/Engineer: Burgess & Niple Ltd.
Contract Amount: $1,600,000.00
Own Forces: 90%
Completed: January, 1998
  
Name of Project: Lower Little Miami, OH WWTP
Owner: Warren County Board of Commissions
Architect/Engineer: PDR Engineers
Contract Amount: $8,000,000.00
Own Forces: 90%
Completed: October, 1997
  
Name of Project: Wards Corner, OH WWTP
Owner: Clermont County Board of Commissions
Architect/Engineer: Burgess & Niple Ltd.
Contract Amount: $ 1,300,000.00
Own Forces: 75%
Completed: December 1996
  
Name of Project: Middle East Fork WWTP
Owner: Clermont County Sewer District
Architect/Engineer: Balke Engineers
Contract Amount: $10,000,000.00
Own Forces: 85%
Completed: July, 1994
  
Name of Project: Felicity, Ohio WWTP
Owner: Clermont County Board of Comm.
Architect/Engineer: Malcolm Pirnie Engineers
Contract Amount: $2,100,000.00
Own Forces: 80%
Completed: January, 1993
  
Name of Project: Milan WWTP Improvements
Owner: Town of Milan
Architect/Engineer: Hometown Engineering
Contract Amount: $1,972,000.00
Own Forces: 90%
Completed: November, 2004
  
Name of Project: Plainfield In, WWTP
Owner: Town of Plainfield, In
Architect/Engineer: The Schneider Corporation
Contract Amount:$9,300,000.00
Own Forces: 70%
Completed: September, 2005
  
Name of Project: Lake Santee WWTP
Owner: Lake Santee Regional Water Company
Architect/Engineer: Commonwealth Engineers
Contract Amount: $1,800,000
Own Forces: 85%
Completed: October, 2000
  
Name of Project: Lawrenceburg, IN Pumping Station
Owner: City of Lawrenceburg
Architect/Engineer: KZF Engineers
Contract Amount: $1,800,000.00
Own Forces: 90%
Completed: September, 1999
  
Name of Project: Lawrenceburg, IN WWTP
Owner: S. Dearborn Regional Sewer District
Architect/Engineer: GRW Engineers
Contract Amount: $9,000,000.00
Own Forces: 80 %
Completed: December, 1998
  
Name of Project: Rising Sun, Indiana WWTP
Owner: City of Rising Sun
Architect/Engineer: Commonwealth Engineers
Contract Amount: $ 500,000.00
Own Forces: 95%
Completed: January, 1998
  
Name of Project: Lawrenceburg Pump Station Phase III
Owner: City of Lawrenceburg
Architect/Engineer: KZF Incorporated
Contract Amount: 1,200,000
Own Forces: 90%
Completed: June, 2001
  
Name of Project: Norris Lake WWTP
Owner: Hallsdale Powell Utility District
Architect/Engineer: Jordan, Jones and Goulding
Contract Amount: $13,299,781.00
Own Forces: 90%
Completed: August, 2007
  
Name of Project: Morgan Co. Correctional Complex WWTP
Owner: State of Tennessee/ Department of Corrections
Architect/ Engineer: Barber McMurry and Ross/Fowler
Contract Amount: $1,146,730.00
Own Forces: 75%
Completed: January, 2007
  
Name of Project: Livingston, TN WTP
Owner: City of Livingston
Architect/Engineer: J.R. Wauford and Company
Contract Amount: $1,480,000.00
Own Forces: 85%
Completed: August, 2006
  
Name of Project: Kingsport WWTP Phase III
Owner: City of Kingsport, TN
Architect/Engineer: Mattern and Craig
Contract Amount: $2,432,154.00
Own Forces: 90%
Completed: February, 2006
  
Name of Project: Plateau Utility District
Owner: Plateau Utility District
Architect/Engineer: Consolidated Tech, Inc.
Contract Amount: $1,632,418.00
Own Forces: 75%
Completed: October, 2005
  
Name of Project: Kingsport, TN WWTP Phase II
Owner: City of Kingsport
Architect/Engineer: Mattern and Craig, Inc.
Contract Amount: $992,897.00
Own Forces: 90%
Completed: October, 2005
  
Name of Project: City of Gatlinburg Trout Farm Raw Water Intake
Owner: City of Gatlinburg
Architect/Engineer: City of Gatlinburg
Contract Amount: $196,770.00
Own Forces: 90%
Completed: May, 2005
  
Name of Project: Lake City WWTP
Owner: City of Lake City, TN.
Architect/Engineer: GRW Elrod Dunson
Contract Amount: $1,135,699.00
Own Forces: 80%
Completed: May, 2005
  
Name of Project: Dickson County Raw Water Intake
Owner: Dickson County
Architect/Engineer: Barge Waggoner
Contract Amount: $3,474,000.00
Own Forces: 75%
Completed: December, 2003
  
Name of Project: NorthEast Knox Utility Phase II
Owner: NorthEast Knox Utility District
Architect/Engineer: Lamar Dunn
Contract Amount: $1,266,000.00
Own Forces: 80%
Completed: August, 2004
  
Name Of: Project: Crossville, TN WTP
Owner: City Of Crossville
Architect/Engineer: Lamar-Dunn
Contract Amount: $5,300,000.00
Own Forces: 75%
Completed: June, 2002
  
Name of Project: Jefferson City, TN WWTP
Owner: City of Jefferson, TN
Architect/Engineer: McGill & Associates
Contract Amount: $2,300,000.00
Own Forces: 90%
Completed: April, 2002
  
Name of Project: Mountain City WWTP
Owner: Town of Mountain City
Architect/Engineer: Lamar Dunn & Associates Inc.
Contract Amount: $922,500.00
Own Forces: 85%
Completed: July, 2001
  
Name of Project: Holston Army Ammunition Plant, Area A
Owner: Area Engineers
Architect/Engineer: Area Engineers
Contract Amount: $1,890,000.00
Own Forces: 85%
Completed: April, 2000
  
Name of Project: Bristol, TN WWTP
Owner: City of Bristol
Architect/Engineer: Arcadis, Geraghty & Miller
Contract Amount: $1,100,000.00
Own Forces: 85%
Completed: October, 1999
  
Name of Project: Oliver Springs, TN WWTP
Owner: Town of Oliver Springs
Architect/Engineer: Elrod-Dunson
Contract Amount: $1,500,000.00
Own Forces: 90%
Completed: April, 1994
  
Name of Project: LaFollette, TN WTP
Owner: LaFollette Utilities Board
Architect/Engineer: Barge, Waggoner, Sumner & Cannon
Contract Amount: $3,300,000.00
Own Forces: 80%
Completed: May, 1992
  
Name of Project: John Flannagan WTP, Haysi, VA
Owner: John Flannagan Water Authority
Architect/Engineer: Olver Inc.
Contract Amount: $4,800,000.00
Own Forces: 75%
Completion: July, 2004
  
Name of Project: Middle Fork Holston River RWI, Abingdon, VA
Owner: Washington County Service Authority
Architect/Engineer: Draper Aden Associates
Contract Amount: $1,200,000.00
Own Forces: 85%
Completed: April, 2000
  
Name of Project: Pond Creek WWTP Upgrade
Owner: Town of Beech Mountain
Architect/Engineer: Davis-Martin-Powell and Associates
Contract Amount: $1,876,547.00
Own Forces: 90%
Completed: November, 2007
  
Name of Project: Appalachian State University WTP
Owner: Appalachian State University
Architect/Engineer: Hobbs, Upchurch and Associates
Contract Amount: $2,738,763.00
Own Forces: 80%
Completed:September, 2007
  
Name of Project:24th Street WTP Phase II
Owner: West Virginia-American Water Company
Architect/Engineer:Montgomery Watson
Contract Amount:$5,000,000.00
Own Forces:85%
Completed:December, 1999