KOCH FOODS
2005 WASTEWATER PRETREATMENT IMPROVEMENTS

 
PROJECT LOCATION: FAIRFIELD, OHIO

PROJECT COST: $475,000

DATE COMPLETED: AUGUST 2005

OWNER: KOCH FOODS


ENGINEER: CABE & ASSOCIATES

  • Constructed an onsite pretreatment process
  • Built a new raw waste pump station
  • Built a new blower building
  • Installed interior and exterior piping
  • Installed new concrete work
  • Installed owner provided DAF units and Process Equipment
  • Installed piping in existing pretreatment building
  • All work was preformed in a short period of time and while the owner was in production of processing poultry