GREATER CINCINNATI, OHIO
Ohio River Crossing Point of Delivery Facility

 
PROJECT LOCATION: CINCINNATI, OHIO

PROJECT COST: $10,000,000

DATE COMPLETED: NOVEMBER 2004

OWNER: Greater Cincinnati Water Works


ENGINEER: MONTGOMERY WATSON

  • Built a 30 MGD pump station with 2.5 MG reservoir
  • Installed six vertical turbine pumps
  • Installed twin 36” high pressure discharge lines
  • Built retaining wall to retain unstable hillside, and masonry structure for chemical, pumping and electrical facilities.