CSX Case Study

Industrial Wastewater Treatment Facility
New Orleans, LA
Job Details
  • Installed a DAF System, Oil/Water Separator,
  • Flash/Floc Mixer, and associated piping
  • Constructed a 63′ x 30′ concrete slab on 28 piles  Installed a 2,000 gallon sludge tank
  • Installed controls and wiring
  • Replaced existing lagoon pumps
  • Installed all interconnecting and underground piping
Project Location: New Orleans, LA
Project Cost: $1,354,544.00
Date Completed: July, 2015
Owner: CSX
Engineer: Arcadis