General Mills Case Study

Wastewater Treatment System
Covington, Georgia
Job Details
  • Installed an equalization system
  • Constructed a new building for the wastewater treatment system equipment
  • Installed a Bioreactor with Membrane Filtration and Reverse Osmosis (RO) Treatment
  • Installed a water reuse system
  • Installed all interconnecting pipe
  • Installed a chemical feed and sludge processing system
  • Installed controls and wiring
Project Location: Covington, GA
Project Cost: $5,387,636.00
Date Completed: August, 2006
Owner: General Mills
Engineer: GRW