PACCAR Engine Wastewater Treatment System
(Design Build) – Columbus, MS

Case Study
Job Details
  • Designed and constructed an onsite pretreatment process
System Included:
  • Influent screening
  • Acid cracking and oil removal
  • Equalization of waste stream
  • Chemical/physical batch treatment
  • Effluent monitoring
  • Sludge conditioning and dewatering
Project Location: Columbus, Mississippi
Project Cost: $1,564,465.00
Date Completed: July, 2009
Owner: PACCAR Engine Company
Engineer: Clearwater Consultants, Inc.