DICKSON COUNTY, TENNESSEE
Client: Water Authority of Dickson County
Project: Cumberland River Plant Raw Water Intake
Value: $ 3.4 million
Process: Constructed 42’ deep wet well in bedrock; installed intake pipe and screen 23’ below normal river pool; built/installed pump station, vertical turbine raw water pumps, chemical feed system, emergency generators, instrumentation and SCADA system. |
|
A word from the superintendent: “BCI was very accommodating for whatever we needed. They were very safety conscious, finished the job on time, and did an awesome job of blasting carefully within 65’ of a residence. Their attitude was ‘whatever it takes.’ ”
--Bruce Trotter, Superintendent and Director of Operations
|
 |
|