Athens WWTP Improvements

City of Athens, Ohio

This project included the construction of a new Headworks Facility that included an influent pump station, influent screening and septage receiving facility. The project also included construction of two (2) primary clarifiers, two (2) secondary clarifiers and a new UV Disinfection tank. The work included select demolition and renovation to the existing operations building, over 5,000 feet of buried site piping and improvements to the existing sludge storage tanks.

Project Location: Athens, Ohio
Project Cost: $15,747,322.62
Date Completed: December 31, 2015
Engineer: Strand
Delivery Method: Design-Bid-Build
Owner: Jessica Adine
City of Athens
30 Curran Dr.
Athens, OH 45701
(740) 593-7636