Highland Heights & Silver Grove Equalization Tanks and Wet Weather Pump Station Facilities

SD1 of Northern Kentucky

Consent Decree project to construct two equalization storage tanks and wet weather pump stations for two existing SD1 pump stations for storm flow retention. Tanks included two AWWA D110 Type III Prestressed Concrete Storage Tanks with capacities of 1.4 and 1.6 million gallons. Wet weather pump stations provide tank fill rates of 8.3 MGD and 7.5 MGD. Support facilities included new 15” sanitary sewers, Diversion Chambers, cast-in- place valve vaults and relocation of existing force mains and sanitary sewers. Tanks and pump stations include instrumentation to monitor fill rates, tank levels and return rates. Tanks also include non-potable water tank wash-down nozzles to clean tanks after flow events. Contract change orders to date include several owner-directed additions to the scope of work, miscellaneous sitework changes due to differing site conditions and several contractor-proposed credits.

Project Location: Highland Heights, Kentucky
Project Cost: $8,497,557
Date Completed: In Progress
Engineer: Wade Trim
Delivery Method: Design-Bid-Build
Owner: Lydia Watkins
SD1 of N. KY
1045 Eaton Dr.
Ft. Wright, KY 41017
(859) 578-6894
Contact Us